Flexible PCB supplier china :What is BGA Reballing?
The process of replacing all soldered balls on the chip ball grid array is called BGA Reballing. BGA or Ball Grid Array is a surface mount package that has an array/grid of metal alloy balls (Tin/ Silver/ Lead/ Copper) at the bottom of a package which is soldered on to a printed circuit board to provide an electrical connection. This package type requires less space than other package types as all the interconnection pins are below the package and not on the side. This allows ICs using this package type of have more interconnects using less space on the Printed Circuit Board. In addition to space, the part of the Semiconductor die/IC is shorter thereby resulting in better performance at high speeds.
As Flexible PCB supplier china know that, BGA Reballing is performed due to the below-listed reasons:
• Overuse of the PCB board: Over time, the solder joints between the chip and the PCB become loose, which result in malfunctioned PCB.
•Technology Upgrade: Based on the technology advancements, sometimes the BGA chip also requires an upgrade.
•Faulty BGA Chip: A faulty BGA chip requires an instant fix that is why sometimes, need of reballing pops up.
•Heating Issues: When a BGA chip gets heated, it melts the underneath solder ball, which in turn creates the solder bridge.
The entire BGA repair or reballing process involves component removal, cleaning, deballing, and reballing.
Flexible PCB supplier china tells you a step by step process for BGA Reballing:
Step 1: Component Removal from the PCB: Remove the associated BGA component. To do this it is important to pre-heat the PCB and then apply heat to the top of the BGA component that needs to be removed, until the solder become molten. Once this happens, the component can be removed/lifted by using a vacuum.
Step 2: Deballing: Apply a water soluble paste on the balls and remove them by using a proper solder blade. Make sure that the surface is flat without any bumps.
Step 3: Clean the deballed part: Clean the PCB surface by using a solder remover like isopropyl alcohol.
Step 4: Apply Paste Flux: Inspect the PCB for scratches and lifted pads and apply a water soluble paste flux.
Step 5: Attach Pre-formed Solder Balls: Place pre-formed solder balls on the PCB.
Step 6: Component placement: Fix the BGA component on the ball array and place it in a reflow oven.
Step 7: Check whether the balls are transferred to the device or not: Take it out from the oven and remove the BGA preform while inspecting that all the balls have transferred to the device. Now, inspect the device thoroughly for the set standards.
Other news about S&L
- Things You Must Consider Before You Choose a High Volume Metal core PCB Assembly Service
- Applications of High Volume High frequency PCB Assembly
- FPC supplierTechnical Specifications for High Volume FPC Assembly
- FPC manufacturerHigh Volume FPC Assembly Benefits
- Flexible PCB supplier china What is High Volume FPC Assembly
- PCB factory china The Characteristics of Heat Flux Used in Hot Air Leveling
- PCB supplier china What is the HASL Process
- PCB manufacturer China:What Electronic Circuits are?
- Factors that Affect Flex rigid PCB Cost
- Rigid Flex PCB Technology and Production Process
Your browsing history
- Why do Multi-layer PCB circuit boards need to use UV three-proof paint
- Metal core PCB:Why does delamination happen?
- Flexible PCB supplier china tells you Comparison of Immersion of Silver and Immersion Tin
- SUCCESS
- FPC supplier:The process of AOI inspection in FPC assembly.
- GE Power awards Sun&Lynn as the best supplier of innovation
- Amphenol
- Automotive PCB:What is characteristic impedance
- FPC supplier:What is Through-hole PCB Assembly
- FlyAudio
A total of -comments【I want to comment】